Wird verarbeitet…
OSM

Jacket Water Preheater Pump

medium 3 Modelle gesamt
Circulates heated jacket water to keep ME warm during standby
8000h
Service Interval
15 yr
Typical Lifetime

Typical Manufacturers

Grundfos Wilo IMO

3 Hersteller · 3 Modelle

🏭

Grundfos

1 ✓ 1 verifiziert
⚙️
TP 40-120/2 ✓ verifiziert Inspector
12 m3/h · 1.1 kW · Freshwater (treated)
Common Failures:
  • • Seal wear from continuous running
  • • Impeller scaling
  • • Motor overheating
Service: Runs continuously during ME standby; check seal annually.
Spares: Grundfos: Ersatzteile per Hersteller-Ersatzteilliste. Mechanische Dichtungen und Laufräder an Bord vorhalten. Lead time: 2-6 Wochen je nach Hersteller.
🏭

IMO

1 ✓ 1 verifiziert
⚙️
ACE 025K3 ✓ verifiziert Inspector
15 m3/h · 1.5 kW · Freshwater (treated)
Common Failures:
  • • Seal leakage
  • • Low flow from impeller fouling
  • • Bearing noise
Service: Screw type for preheater circuit; less common but robust.
Spares: IMO: Ersatzteile per Hersteller-Ersatzteilliste. Mechanische Dichtungen und Laufräder an Bord vorhalten. Lead time: 2-6 Wochen je nach Hersteller.
🏭

Wilo

1 ✓ 1 verifiziert
⚙️
TOP-S 30/10 ✓ verifiziert Inspector
10 m3/h · 0.75 kW · Freshwater (treated) · Centrifugal Pump
Common Failures:
  • • Shaft seal leak
  • • Impeller blockage from scale
  • • Thermostat malfunction
Service: Circulation pump; ensure preheater thermostat set to 60-70 deg C.
Spares: Wilo: Ersatzteile per Hersteller-Ersatzteilliste. Mechanische Dichtungen und Laufräder an Bord vorhalten. Lead time: 2-6 Wochen je nach Hersteller.
Pros
  • High efficiency in water circulation
  • Compact design for space-saving installation
  • Durable construction for long service life
Cons
  • Potential for shaft seal leaks
  • Risk of impeller blockage from scale buildup
  • Thermostat malfunction can lead to temperature control issues
Typical Vessels: ContainerBulk CarrierTanker
Decision Guide: Choose if you need a reliable and efficient pump for jacket water preheating in marine engines. Avoid if you have limited space for maintenance or if scale buildup is a significant concern in your operation.
Use Cases: Typically deployed in the engine rooms of ships for preheating jacket water to ensure optimal engine performance and efficiency.