Charge Air Cooler (Standalone)
high
3 Modelle gesamt
Standalone charge air cooler units (separate from engine-integrated SAC)
8000h
Service Interval
20 yr
Typical Lifetime
Typical Manufacturers
Alfa Laval
Vestas
MAN PrimeServ
3 Hersteller · 3 Modelle
🏭
Alfa Laval
1 ✓ 1 verifiziert
ACE Charge Air
✓ verifiziert
Inspector
1500 kW
· Charge Air / Freshwater
type_specs: {'Design Pressure M-Line': '>10 bar (145 psi)', 'Marine Engine Room Modelle': 'T6 (DN60, 800 kW) bis T35 (DN350, 35.000 kW)', 'Marine FSRU Modelle': 'TS45, T45, T50 (DN450-500, 45.000-55.000 kW)', 'Temperaturbereich Standard': '0-180°C (je nach Modell)', 'FSRU Temperaturbereich': '-50 bis 150°C', 'Plattentypen': 'Chevron, Gemini Doppelwand, FlexFlow™'}
product_lines: ['M-Line (High Pressure Series: M3, M6, M10, M15)', 'T-Series (Industrial: T2, T5, T6, T8, T10, T20, T25)', 'AQ-Series (HVAC: AQ1, AQ2, AQ3, AQ4, AQ10)', 'Marine Line (Engine Room: T6-T35; FSRU: TS45, T45, T50)', 'Baseline (Competitive Line)', 'Hygienic Line (Premium)']
hx_type: Alfa Laval Gasketed Plate Heat Exchangers (GPHE)
source: verified_alfalaval_hx_type_2026-06
needs_verification: False
datasheet_url: https://www.alfalaval.com/globalassets/documents/local/united-states/heat-transfer/gasketed-plate-and-frame-heat-exchangers/alfa-laval---gphe-catalog-2022.pdf
Common Failures:
- • _hinweis
- • items
Service: Clean air-side with approved degreaser; check for water leaks into charge air.
Spares: Alfa Laval: Dichtungssatz an Bord vorhalten. Platten-Reinigungschemikalien bevorraten. Lead time: 2-6 Wochen.
🏭
MAN PrimeServ
1 ✓ 1 verifiziert
SAC-TC 200
✓ verifiziert
Inspector
2000 kW
· Charge Air / Freshwater
Common Failures:
- • Water leak into air side
- • Corrosion from acidic condensate
- • Gasket failure
Service: OEM replacement for MAN engines; use MAN-specified gaskets and seals.
Spares: MAN PrimeServ: Dichtungssatz an Bord vorhalten. Platten-Reinigungschemikalien bevorraten. Lead time: 2-6 Wochen.
🏭
Vestas
1 ✓ 1 verifiziert⚙️
aircoil CAC-150
✓ verifiziert
Inspector
1200 kW
· Charge Air / Freshwater
Common Failures:
- • Tube leakage
- • Fin corrosion
- • Reduced cooling from fouling
Service: Vestas aircoil; pressure test at class survey; clean air fins.
Spares: Vestas: Dichtungssatz an Bord vorhalten. Platten-Reinigungschemikalien bevorraten. Lead time: 2-6 Wochen.