Charge Air Cooler (Standalone)

high 3 / 3 Modelle (Inspector)
Standalone charge air cooler units (separate from engine-integrated SAC)
8000h
Service Interval
20 yr
Typical Lifetime

Typical Manufacturers

Alfa Laval Vestas MAN PrimeServ
Inspector Mode Show All 3 / 3 with inspector value

3 Hersteller · 3 Modelle

🏭

Alfa Laval

1 ✓ 1 verifiziert
Alfa Laval ACE Charge Air
ACE Charge Air ✓ verifiziert Inspector
1500 kW · Charge Air / Freshwater
type_specs: {'Design Pressure M-Line': '>10 bar (145 psi)', 'Marine Engine Room Modelle': 'T6 (DN60, 800 kW) bis T35 (DN350, 35.000 kW)', 'Marine FSRU Modelle': 'TS45, T45, T50 (DN450-500, 45.000-55.000 kW)', 'Temperaturbereich Standard': '0-180°C (je nach Modell)', 'FSRU Temperaturbereich': '-50 bis 150°C', 'Plattentypen': 'Chevron, Gemini Doppelwand, FlexFlow™'}
product_lines: ['M-Line (High Pressure Series: M3, M6, M10, M15)', 'T-Series (Industrial: T2, T5, T6, T8, T10, T20, T25)', 'AQ-Series (HVAC: AQ1, AQ2, AQ3, AQ4, AQ10)', 'Marine Line (Engine Room: T6-T35; FSRU: TS45, T45, T50)', 'Baseline (Competitive Line)', 'Hygienic Line (Premium)']
hx_type: Alfa Laval Gasketed Plate Heat Exchangers (GPHE)
source: verified_alfalaval_hx_type_2026-06
needs_verification: False
datasheet_url: https://www.alfalaval.com/globalassets/documents/local/united-states/heat-transfer/gasketed-plate-and-frame-heat-exchangers/alfa-laval---gphe-catalog-2022.pdf
Common Failures:
  • • _hinweis
  • • items
Service: Clean air-side with approved degreaser; check for water leaks into charge air.
Spares: Alfa Laval: Dichtungssatz an Bord vorhalten. Platten-Reinigungschemikalien bevorraten. Lead time: 2-6 Wochen.
🏭

MAN PrimeServ

1 ✓ 1 verifiziert
MAN PrimeServ SAC-TC 200
SAC-TC 200 ✓ verifiziert Inspector
2000 kW · Charge Air / Freshwater
Common Failures:
  • • Water leak into air side
  • • Corrosion from acidic condensate
  • • Gasket failure
Service: OEM replacement for MAN engines; use MAN-specified gaskets and seals.
Spares: MAN PrimeServ: Dichtungssatz an Bord vorhalten. Platten-Reinigungschemikalien bevorraten. Lead time: 2-6 Wochen.
🏭

Vestas

1 ✓ 1 verifiziert
⚙️
aircoil CAC-150 ✓ verifiziert Inspector
1200 kW · Charge Air / Freshwater
Common Failures:
  • • Tube leakage
  • • Fin corrosion
  • • Reduced cooling from fouling
Service: Vestas aircoil; pressure test at class survey; clean air fins.
Spares: Vestas: Dichtungssatz an Bord vorhalten. Platten-Reinigungschemikalien bevorraten. Lead time: 2-6 Wochen.